If you have read about Agra Metro, you have probably seen two names: the Yellow Line and the Blue Line. They are often mentioned together, yet only one of them carries passengers today. This article explains the difference in plain language, what is open, what is still being built, and how to read metro news without being misled by dates and figures that keep changing.
Why does Agra Metro have two lines?
A single line cannot reach every part of a city, so Agra’s first phase was planned as two corridors that together cover roughly 29 km. One line runs through the historic heart of Agra and past its best-known monuments. The other crosses the city on a different route, connecting areas near the railway side with the south-west. Planning two corridors means more neighbourhoods can eventually use the metro, not only those close to the tourist sights.
The Yellow Line (Corridor 1)
The Yellow Line is planned to run from Sikandra to Taj East Gate, a length of about 14 km. It is the line that has already opened in part. The section between Taj East Gate and Mankameshwar has been carrying passengers since 6 March 2024, and it includes six stations: Taj East Gate, Shaheed Captain Shubham Gupta (also called Basai), Fatehabad Road, Taj Mahal, Agra Fort and Mankameshwar. Three of these are elevated and three are underground.
The rest of the Yellow Line, running out towards Sikandra, is still under construction. For the current picture, read our Corridor 1 page.
The Blue Line (Corridor 2)
The Blue Line is planned between Agra Cantt and Kalindi Vihar, about 15 km long. It is not yet open to passengers. Reports describe it as largely elevated. Its exact station list and any interchange with the Yellow Line may still change, which is why we do not name an interchange station. See our Corridor 2 page for more.
Yellow Line and Blue Line side by side
| Yellow Line | Blue Line | |
|---|---|---|
| Route | Sikandra to Taj East Gate | Agra Cantt to Kalindi Vihar |
| Planned length | About 14 km | About 15 km |
| Status | Six stations open, rest under construction | Under construction |
| Can you ride it now? | Yes, on the open section | No |
How to read Agra Metro news
Metro projects are complicated, and headlines can be confusing. A few habits help:
- Separate “open” from “planned”. A station shown on a project map is not necessarily open to passengers.
- Treat dates as targets. Opening dates for metro sections are often revised, so a date in an article may no longer apply.
- Watch the numbers. Lengths and station counts vary between sources, for example 5.2 km versus about 6 km for the open section, depending on how they are measured.
- Prefer the official source. When in doubt, check UPMRC.
What this means for your trip today
If you are visiting Agra, only the Yellow Line’s open section is relevant. Use the route map to see the station order, the fare finder for an estimate, and train timings for hours. You do not need to think about the Blue Line until it opens.
Frequently asked questions
Which Agra Metro line is open?
Only part of the Yellow Line, between Taj East Gate and Mankameshwar.
Is the Blue Line open?
No. It is under construction.
Do the two lines connect?
Metro lines are normally linked at an interchange, but check the official map for confirmed details.
Why do sources give different lengths?
Because they measure different stretches and plans are revised during construction.